If you wish to enter into a new electricity contract or change your contract, please apply using our designated application form and clearly state the following information:
Contract type, electricity supply method, supply and demand point, demand location, supply voltage, contract load equipment, contract main switch, Contract ampere, Contracted Electricity Capacity, contract power, Power generation equipment, industry, purpose, desired start date of use, period of use, payment method, etc.
Since there are many sections to fill out on the application form and there are some items to which we would like you to pay particular attention, we have posted instructions on how to fill out the application form. Please check it out.
- Flat-rate electric light, Public Street Lighting Plan A, Public Street Lighting Plan A (traffic signal light)
- Temporary Lighting Plan (ABC) and Temporary Power Plan
- Agriculture Power Plan (AB)
- Smart Family Plan, Smart Business Plan, Residential lighting (ABC), Public Street Lighting Plan B (traffic signal light)
- All Electric Nighttime Select High-Load Lighting Plan
- Low- Voltage Seasonal Power Plan, Late Night Power (for frost prevention), Low- Voltage Power, electricity for time signals
- The application form is in a 3 or 4 copy format and cannot be downloaded from this page. If you require an application form, please contact your nearest sales office.
- The application form is a five-copy format and cannot be downloaded from this page. If you require additional copies, please contact your nearest electricity distribution office.
- If you are applying for the application of special measures to a new demand location, etc. (including contractual changes to increase or decrease the number of applicable locations), please submit this Application Confirmation Document.
- If you are making a new application for power interchange between demand locations (including changes to the contract to increase or decrease the number of applicable locations), please submit this Application Confirmation Form.
- If you are applying for a main switch contract (electronic breaker), please submit this commitment along with the main switch specifications.
- If you live in a subdivision and would like to have a new utility pole installed before applying, please submit this application form.
For application documents etc. when installing solar Power generation equipment, please refer to the application documents etc.
For application documents and other information when installing private Power generation equipment and storage batteries, please see Application for connecting storage batteries, etc. to low-voltage lines.