Power transmission consignment charge is the amount equivalent to the transmission and distribution network usage fee required to supply electricity to customers, and is a reference value calculated by applying the customer's contract details and electricity usage to the wheeling supply terms and conditions of Kyushu Electric Power Transmission and Distribution Co., Ltd. This page explains how to calculate Power transmission consignment charge for low-voltage customers.

Calculation method for Power transmission consignment charge customers

Low-voltage metered-rate customers can calculate Power transmission consignment charge (Notes 2, 3, 4) by multiplying the amount of electricity used by the average low-voltage Wheeling Charge (Note 1).

Power transmission consignment charge =

Customer's

Electricity usage

[ ]kWh

×

Low voltage Wheeling Charge
Average unit price

tax included 10 yen 65 sen

  1. This calculation is based on Kyushu Electric Power Transmission and Distribution Co., Ltd.'s transmission and supply terms and conditions.
  2. This is a re-posting of the connection transmission service fee (equivalent to the demand side Wheeling Charge) included in the electricity bill, and is a reference value.
  3. Adjustments for universal service to remote islands are not taken into account.
  4. This includes Compensation surcharge stipulated by law (0.08 yen including tax included) (Note 5) and Nuclear decommissioning surcharge (0.09 yen including tax included) (Note 6).
  5. Compensation surcharge is the amount equivalent to the costs that should have been prepared for compensation for nuclear damage before the Fukushima Daiichi Nuclear Power Plant accident.
  6. Nuclear decommissioning surcharge is the amount equivalent to the cost of smoothly decommissioning a nuclear power plant, in line with the basic energy policy of reducing dependency on nuclear power.

Calculation method for Power transmission consignment charge for flat-rate customers

Please check Power transmission consignment charge (Notes 1, 2, and 3) in the table below according to your contract details.

Contract Type

Classification

Wheeling Charge

Equivalent amount (tax included)

Compensation

Equivalent amount

(tax included) (Note 4)

Facilitating decommissioning

Equivalent amount of contribution

(tax included) (Note 4)

Flat rate lighting

Public Street Lighting Plan A

Agricultural lighting

electric light

Per lamp up to 10W

39 yen 09 sen

0 yen 31 sen

0 yen 35 sen

For one lamp over 10W up to 20W

78 yen 19 sen

0 yen 62 sen

0 yen 70 sen

For one lamp over 20W up to 40W

156 yen 37 sen

1 yen 24 sen

1 yen 40 sen

For one lamp over 40W up to 60W

234 yen 55 sen

1 yen 86 sen

2 yen 10 sen

For one lamp over 60W up to 100W

390 yen 93 sen

3 yen 11 sen

3 yen 50 sen

For each lamp over 100W up to 100W

390 yen 93 sen

3 yen 11 sen

3 yen 50 sen

Small Devices

Per device up to 50VA

116 yen 77 sen

0 yen 93 sen

1 yen 04 sen

For one device over 50VA up to 100VA

233 yen 53 sen

1 yen 86 sen

2 yen 09 sen

For each device over 100VA up to 50VA

116 yen 77 sen

0 yen 93 sen

1 yen 04 sen

Temporary Lighting Plan A

(per day)

When the total capacity is up to 50VA

3 yen 47 sen

0 yen 03 sen

0 yen 03 sen

When the total capacity is over 50VA and up to 100VA

6 yen 93 sen

0 yen 05 sen

0 yen 06 sen

If the total capacity exceeds 100VA and is up to 500VA,

6 yen 93 sen

0 yen 05 sen

0 yen 06 sen

When the total capacity is over 500VA and up to 1kVA

69 yen 34 sen

0 yen 50 sen

0 yen 56 sen

If the total capacity exceeds 1kVA and is up to 3kVA,

69 yen 34 sen

0 yen 50 sen

0 yen 56 sen

Temporary Power Plan

(per day)

For contract power up to 0.5kW

46 yen 93 sen

0 yen 27 sen

0 yen 30 sen

Contract power: from 1kW to 5kW, for every 1kW

93 yen 86 sen

0 yen 53 sen

0 yen 59 sen

Late Night Power A

Per 1contract

1,027 yen 00 sen

8 yen 00 sen

9 yen 00 sen

Agriculture Power Plan B

(per day)

Contract power: 0.5kW

16 yen 89 sen

0 yen 13 sen

0 yen 15 sen

Contract power: 1kW

33 yen 78 sen

0 yen 26 sen

0 yen 30 sen

Contract power: 2kW

67 yen 57 sen

0 yen 53 sen

0 yen 59 sen

Contract power: 3kW

101 yen 34 sen

0 yen 79 sen

0 yen 89 sen

Contract power: 4kW

135 yen 13 sen

1 yen 05 sen

1 yen 18 sen

Contract power: 5kW

168 yen 91 sen

1 yen 32 sen

1 yen 48 sen

  1. This calculation is based on Kyushu Electric Power Transmission and Distribution Co., Ltd.'s transmission and supply terms and conditions.
  2. This is a re-posting of the connection transmission service fee (equivalent to the demand side Wheeling Charge) included in the electricity bill, and is a reference value.
  3. Adjustments for universal service to remote islands are not taken into account.
  4. Power transmission consignment charge includes Compensation surcharge stipulated by law (Note 5) and Nuclear decommissioning surcharge (Note 6).
  5. Compensation surcharge is the amount equivalent to the costs that should have been prepared for compensation for nuclear damage before the Fukushima Daiichi Nuclear Power Plant accident.
  6. Nuclear decommissioning surcharge is the amount equivalent to the cost of smoothly decommissioning a nuclear power plant, in line with the basic energy policy of reducing dependency on nuclear power.