1. Contract details, etc.

(1) Contract Outline

(To be implemented on May 1, 2025)

(To be implemented on April 1, 2024)

(Implemented on April 1, 2023)

(Implemented on July 1, 2022)

(For an overview of the system changes accompanying the April 2022 amendment to the Renewable Energy Special Measures Act, please click here.)

(Reference) For information on the amendment to the Renewable Energy Act, please see the Agency for Natural Resources and Energy website here.

2. Registration Procedure

For inquiries regarding grid interconnection, please contact Kyushu Electric Power Transmission and Distribution

3. Application documents

Where to submit your application

If FIT certification is planned

If you have a contract with us for retail purchase (note), and would like to apply for equipment changes, please apply as follows. Please note that applications are only accepted for the addition or reduction of Power generation equipment that does not have a sub-meter installed.

  • If you have applied for re-instatement of your purchase contract after April 2017, this will be treated as a transmission and distribution purchase, so please submit the application to the transmission and distribution purchase destination.
  • For information on purchasing entities (retail purchase/transmission and distribution purchase), please check the latest "Notice of Purchased power amount."

Grid voltage

Power source type

Where to submit

low pressure

Solar

Easy Net

Renewable energy facilities other than solar power

Contract and fee center in charge of your contract area Renewable Energy Group

High voltage/special high voltage

Solar

Renewable energy facilities other than solar power

Contract and billing center in charge of your contract area

For applications other than low voltage solar power and generator installation, please mail to the contract and fee center in charge according to your contract area.

Contract area

Contract and fee center in charge

branch

Sales Office

Kitakyushu

Kokura

Yawata

Yukuhashi

Tagawa

Fukuoka Contract and Fee Center Renewable Energy Group

 

 

〒810-8720

Fukuoka City, Fukuoka Prefecture, Japan

email address

fukukeiryouc_kounyu@qop.kyuden.co.jp

Iizuka

 

 

 

Fukuoka

Fukuma

Fukuoka East

Fukuoka

Fukuoka West

Fukuoka South

Amagi

Kurume

Yame

Omuta

 

 

 

Saga

Karatsu

Tosu

Saga

Takeo

Nagasaki

Sasebo

Hirado

Ohmura

Shimabara

Nagasaki

Goto

 

 

Oita

Nakatsu

Hita

Beppu

Oita

triple

Saeki

 

 

Kumamoto

Tamana

Otsu

Kumamoto West

Kumamoto East

Kumamoto Contract and Fee Center Renewable Energy Group

 

〒862-0951

1-6-36 Suizenji, Chuo-ku, Kumamoto City, Kumamoto Prefecture

 

email address

kumakeiryouc_kounyu@qop.kyuden.co.jp

Uki

Yatsushiro

Amakusa

Hitoyoshi

Miyazaki

Nobeoka

Hinata

Miyazaki

Takanabe

Miyakonojo

Nichinan

 

 

Kagoshima

Izumi

Kawauchi

Kirishima

Kagoshima

Kaseda

Kanoya

 

 

(1) In the case of an application for low-voltage Power generation equipment that is scheduled to obtain FIT certification

Purchase contract application documents

Required Documents

Changes in Power generation equipment

Name change

Decline

Change account

Application for sales of electricity from renewable energy Power generation equipment [low voltage] (for retail purchase)
(Note 1) This form must also be submitted if you are also installing storage batteries or Power generation equipment other than solar power.

(Note 2) As of October 24, 2018, it is possible to transfer funds to financial institutions that are members of the National Bank Cooperative Association. (Please check the application form for details.)

Additional documents for applications regarding sales of electricity from renewable energy sources
(Note 1) Please submit this form when adding or removing Power generation equipment or installing multiple inverters.

(Note 2) Please submit this form if you are also installing Power generation equipment other than storage batteries or solar power generation equipment.

Technical study materials

If there are any changes to Power generation equipment that have concluded a purchase agreement with our company, you will need to submit an application for technical review to our company.

If you are adding Power generation equipment at low voltage 10kW or above, you will need to submit a "Consent Form for application for power supply contract taking into account non-farm type connection".

Application documents for supply contract

Required Documents

Changes in Power generation equipment

Name change

Decline

Change account

  • "Electricity Use Application Form and Customer Equipment Construction Design Drawings (Completion Notification) and Construction Certificate"
  • "Attached wiring diagram"

(Note) You will need to submit the application documents for the supply contract together with the application documents for the electricity supply contract.

others

Required Documents

Changes in Power generation equipment

Name change

Decline

Change account

Business succession notification form
(Note) Please also submit the change approval notice or a copy of the notification form with the acceptance seal of the Bureau of Economy, Trade and Industry.

Resignation letter

Resignation letter (example)

(Note) Please submit this when withdrawing your application.

When changing the name

When applying for a name change, please submit the following documents by mail to the Contract and Billing Center in charge of your contract area.

 

  • Application for sales of electricity from renewable energy Power generation equipment [low voltage] (for retail purchase)
  • As a document to prove that the change procedure has been carried out, the change approval notice must be a copy of the notification form with the acceptance seal of the Bureau of Economy, Trade and Industry.
  • Business succession notification form

(For those who installed a measuring device themselves before March 2008)

(2) In the case of applications for high-voltage or extra-high-voltage Power generation equipment that are scheduled to obtain FIT certification

If there are any changes to Power generation equipment that have concluded a purchase agreement with our company, you will need to submit an application for technical review to our company.

Advance consultation (optional)

Connection Considerations

  • When applying for high voltage, please be sure to check the "Checklist of items to be confirmed when applying", which lists points to note when applying, and submit one copy of the checklist with all boxes checked along with the application form.

Required Documents

・Connection Consideration Application Form (copy)

・Response to connection application (cover) (copy)

・Connection Consideration Response (attached) (copy)

 

(Note 1) For the application form for connection consideration, please refer to the Contract Guidelines, Application Procedures, Technical Standards, etc. page.

(Note 2) When installing additional Power generation equipment at high or extra-high voltage, you will need to submit a "Letter of Consent for Application for Electricity Supply Contract Considering Non-Firm Type Connection."

Word Application for power supply contract based on "non-farm type connection" [Agreement form]

(Note 3) Please submit the documents below only if you have requested Kyushu Electric Power Transmission and Distribution to confirm the need for connection consideration before submitting your connection consideration application.

・Request for confirmation of necessity of connection consideration (copy)

・Results of the request to confirm the necessity of connection consideration (photo)

Submit to our company

Contract and billing center in charge of your contract area

Statement of intent

Required Documents

Electricity Use Application Form

Application form for selling electricity from renewable energy sources [high voltage/extra high voltage] (for retail purchase)

For the format of the statement of intent, please refer to the Contract Guidelines, Reception Guidelines, Technical Standards, etc. page.

Notification of change to business plan approval (copy)

(Note) After concluding the connection contract, please complete the "change approval" procedure promptly and submit a copy of the Change Approval Notice to the Contract and Billing Center in charge of your contract area.

Submit to our company

Contract and billing center in charge of your contract area

others

Required Documents

Changes in Power generation equipment

Name change

Decline

Change account

Business succession notification form
(Note) Please also submit the change approval notice or a copy of the notification form with the acceptance seal of the Bureau of Economy, Trade and Industry.

Resignation letter

Resignation letter (example)

(Note) Please submit this when withdrawing your application.

When changing the name

When applying for a name change, please submit the following documents by mail to the Contract and Billing Center in charge of your contract area.

 

  • Application form for selling electricity generated from renewable energy sources [high voltage/extra high voltage] (for retail purchase)
  • As a document to prove that the change procedure has been carried out, the change approval notice must be a copy of the notification form with the acceptance seal of the Bureau of Economy, Trade and Industry.
  • Business succession notification form

remarks

Please submit your application by post (registered mail or letter pack).

If you are not planning to obtain FIT certification

If you would like to sell electricity to us without planning to obtain FIT certification, please contact us at the number of the office that has jurisdiction over your location.

  1. If you have no plans to obtain FIT certification and have no intention of selling electricity, please contact the electricity distribution company contact information listed below.
  2. If you wish to sell electricity to our retail division without planning to obtain FIT certification, please contactthe Contract and Fee Center responsible for your contract area.

(3) In the case of an application for low-voltage Power generation equipment without plans to obtain FIT certification

If you are building new Power generation equipment that have signed a purchase agreement with us, you will need to submit an application for technical review to us.

  • When applying, please be sure to check the "Checklist of items to be checked when applying", which lists points to note when applying. Please submit one copy of the checklist with all boxes checked together with your application form.

Required Documents

New construction or changes to Power generation equipment

Name change

Decline

Change account

[Non-FIT] Application for selling electricity from renewable energy Power generation equipment [low voltage] (for retail purchase)

(Note 1) This form must also be submitted if you are also installing storage batteries or Power generation equipment other than solar power.

(Note 2) As of October 24, 2018, it is possible to transfer funds to financial institutions that are members of the National Bank Cooperative Association. (Please check the application form for details.)

Additional documents for applications regarding sales of electricity from renewable energy sources
(Note 1) Please submit this form when increasing or decreasing the size of Power generation equipment, when building new non-FIT facilities, or when installing multiple inverters.

(Note 2) Please submit this form if you are also installing Power generation equipment other than storage batteries or solar power generation equipment.

Technical study materials

If you are building new Power generation equipment that have signed a purchase agreement with us, you will need to submit an application for technical review to us.

Required Documents

For the form regarding the connection contract, please refer to the Contract Guidelines, Application Guidelines, Technical Standards, etc. page.

Submit to our company

Contract and billing center in charge of your contract area

Application documents for supply contract

Required Documents

New construction or changes to Power generation equipment

Name change

Decline

Change account

  • "Electricity Use Application Form and Customer Equipment Construction Design Drawings (Completion Notification) and Construction Certificate"
  • "Attached wiring diagram"

(Note) You will need to submit the application documents for the supply contract together with the application documents for the electricity supply contract.

others

Required Documents

New construction or changes to Power generation equipment

Name change

Decline

Change account

Resignation letter

Resignation letter (example)

(Note) Please submit this when withdrawing your application.

In the case of re-start (moving to a house with Power generation equipment installed and using electricity)

  • After we receive your application to start using electricity, please submit the following documents to the Contract and Fee Center in charge of your area by mail to conclude a solar power purchase contract.
  • A copy of the change approval notice or notification form with the acceptance seal of the Bureau of Economy, Trade and Industry affixed as a document to prove that the change procedure has been carried out.

(For those who installed a measuring device themselves before March 2008)

(4) In the case of applications for high-voltage or extra-high-voltage Power generation equipment without plans to obtain FIT certification

Connection Considerations

  • When applying for high voltage, please be sure to check the "Checklist of items to be confirmed when applying", which lists points to note when applying, and submit one copy of the checklist with all boxes checked along with the application form.

Required Documents

・Connection Consideration Application Form (copy)

・Response to connection application (cover) (copy)

・Connection Consideration Response (attached) (copy)

 

(Note 1) For the application form for connection consideration, please refer to the Contract Guidelines, Application Procedures, Technical Standards, etc. page.

(Note 2) Please submit the documents below only if you have requested Kyushu Electric Power Transmission and Distribution to confirm the need for connection before submitting your connection application.

・Request for confirmation of necessity of connection consideration (copy)

・Results of the request to confirm the necessity of connection consideration (photo)

Submit to our company

Contract and billing center in charge of your contract area

remarks

Please submit your application by post (registered mail or letter pack).

others

Required Documents

New construction or changes to Power generation equipment

Name change

Decline

Change account

Resignation letter

Resignation letter (example)

(Note) Please submit this when withdrawing your application.

remarks

Please submit your application by post (registered mail or letter pack).

(5) Battery interconnection

Customers who have signed a purchase agreement with us and wish to combine solar power generation and storage batteries should submit an application to the Contract and Fee Center responsible for their contract area.

Required Documents

For application form, please refer to the Contract Guidelines, Application Procedures, Technical Standards, etc. page.

(Note) When installing a storage battery, you will need to apply for a supply contract (facility change) in addition to applying for grid connection.

Submit to our company

Low voltage: Easy Net

High voltage/extra high voltage: Contract and billing center in charge of your contract area

(6) Interconnection of Power generation equipment with reverse power flow of less than 50 kW

For high-voltage interconnections where the reverse power flow from Power generation equipment is less than 50 kW, please use the following form.

 

In addition, in the case of "extra-high voltage interconnection" or "reverse power flow of 50 kW or more," a connection study is required, so please submit a connection study application form to the Contract and Billing Center in charge of your contract area.

Application documents (technical review document format)

Required Documents

For application form, please refer to the Contract Guidelines, Application Procedures, Technical Standards, etc. page.

Submit to our company

Contract and billing center in charge of your contract area